Ceco’s wide-module longforms provided the ideal solution for The Link at Uptown in Dallas, Texas, to create the long spans necessary for this curved 25-story base garage and office tower.
PROJECT TYPE:
Office Building, 23,536 SF / Typical Level
DESIGN LOADS
Additional DL = 10 PSF, LL = 100 PSF
TYPICAL FLOOR MATERIAL QUANTITIES
• Slab Concrete: 729 CY, equivalent slab depth of 10”
• Slab Rebar: 85 TNS, equivalent 7.2 # / SF
• Beams (only) PT: 15,750 lbs., equivalent 0.67 # / SF
TYPICAL FLOOR PLAN
Total depth 20.75” for all joists most beams, select (3) beams at 24.25” & 32.0”
Bay Width – Varied < 49’ Bays, Length 30’ Bays
Pan Size – 16” depth, 66” width, 4.75” thick slab
TYPICAL OFFICE-LEVEL CYCLE
7 Days
Download a printable version of this Pan Slab Construction Project Spotlight. For more details and to view a BIM video, see Ceco’s The Link at Uptown project profile.