Southern Operation

32-Story concrete wide module office building and parking garage built by Ceco Concrete Construction using the wide module concrete formwork and structural system to increase rigidity and cut costs. Ceco maintained schedule while constructing all three buildings simultaneously and achieving project safety goals.

Project Details

  • Project Owner:
    Anadarko Petroleum
  • Contractor:
    Harvey
  • Architect:
    Gensler
  • Structural Engineer:
    Haynes Whaley
  • Gross Building Area:
    1,238,000
  • CECO Scope:
    Concrete Formwork
  • Date Completed:
    2014