Hayden Ferry Lakeside, Phases 1-3

Multi-Story Concrete Office Buildings with Subterranean Parking

Tempe, AZ

Hayden Ferry Lakeside, Phases 1-3

Southwest Operation

These two concrete office buildings were built by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor. Phase 1 of this project was completed in 2002, Phase 2 in 2006, and Phase 3 in 2015.

Project Details

  • Project Owner:
    Phase 1-Suncor, 2-Hayden Ferry Lakeside LLC, 3-PKY Fund II Phoenix III LLC
  • Contractor:
    Phase 1-McCarthy, 2-McCarthy, 3-Ryan Companies
  • Architect:
    Phase 1-Cornoyer-Hedrick, 2-DFD Cornover-Hedrick. 3-Davis Architecture
  • Structural Engineer:
    Caruso Turley Scott
  • Gross Building Area:
    919,058
  • Date Completed:
    2015