Moonrise Hotel

7-Story Post-Tensioned Concrete Hotel

St Louis, MO

  • post-tensioned concrete hotel
  • post-tensioned concrete hotel

Moonrise Hotel

South Central Operation

This 7-story post-tensioned concrete hotel was built by Ceco Concrete Construction, a nationwide design-assist structural concrete contractor. Ceco contracted with Paric Corporation to construct the entire concrete frame. Work managed by Ceco included drilled piers, foundations, formwork, concrete, rebar installation and post-tensioning. In order to mediate complicated post-tension tendon layout caused by the “L” – shaped floor configuration, Ceco completed each slab in a single, continuous pour. Ceco managed an aggressive schedule completing one floor each week, making it possible for the hotel to maintain it’s grand opening date.

Project Details

  • Project Owner:
    Moonrise Hotel
  • Contractor:
    Paric Corporation
  • Architect:
    ACI Boland
  • Structural Engineer:
    KPFF
  • Gross Building Area:
    88,599
  • CECO Scope:
    Concrete Frame
  • Gross Budget:
    2,450,000
  • Date Completed:
    2008