OSF Medipark Parking Structure

7-Level 1,495-Space Cast-In-Place Parking Structure in Peoria, IL

Peoria, IL

  • 7-level cast-in-place
  • 7-level cast-in-place
  • 7-level cast-in-place

OSF Medipark Parking Structure

South Central Operation

This 7-level cast-in-place parking structure was built by Ceco Concrete Construction, a nationwide design-assist structural concrete contractor. This project was partially built below grade, allowing drive-in access from multiple floors. During construction phase the owner chose to add an additional level to the project to avoid needs for future expansion later.

Project Details

  • Project Owner:
    OSF Medipark
  • Contractor:
    Mortenson
  • Architect:
    ACI Boland
  • Structural Engineer:
    KPFF
  • Gross Building Area:
    429,407
  • CECO Scope:
    Concrete Formwork
  • Gross Budget:
    3,800,000
  • Date Completed:
    2007