Utah State Capitol Restoration

Concrete Foundation Stabilization and Isolation Beam and Slab Construction at Grade

Salt Lake City, UT

Utah State Capitol Restoration

Southwest Operation

This concrete foundation stabilization and isolation  of the Utah State Capitol was performed by Ceco Concrete Construction, a nationwide design-assist structural concrete formwork and frame contractor. To complete this project Ceco worked fully inside the existing building with very short clear story heights, overcoming the challenges of working with a building originally constructed at the turn of the century.

Project Details

  • Project Owner:
    State of Utah
  • Contractor:
    Jacobsen - Hunt Joint Venture
  • Architect:
    CRG Architects
  • Structural Engineer:
    CRG / Reaveley Engineers
  • Gross Building Area:
    75,500
  • CECO Scope:
    Concrete Formwork
  • Date Completed:
    2005